This project will update regulatory traffic signs (e.g., Stop, Yield) and posts that are in existing Wascana Centre Authority (WCA) green u-frames as well as regulatory signs and posts on existing standard painted posts. It will also replace “No Parking” WCA signs. This will allow for the use of current, standardized traffic sign forms and sizes produced by traffic sign suppliers; improve visibility against the green landscaping; and reduce longterm maintenance costs of painting or repairing/replacing rusting poles.

Yield sign
Stop sign
Existing regulatory traffic signs in Wascana Centre Authority u-frames.

Cost

This is one of 6 projects costing a combined total of $935,000:

  • Traffic Sign Replacement

  • Highway Information Signage and Campus Perimeter

  • Building Addresses and Street Names

  • Renumbering Parking Lots

  • Directional Signage

  • Internal Wayfinding

Status (as of January 26, 2017)

  • Underway; anticipated completion by September 2017